Skip to content
Nonprofiteer
← All organizations

MASONRY ALLIANCE FOR CODES AND STANDARDS

EIN 33-1134052 HERNDON, VA

Browse the largest nonprofits in Virginia

Revenue 2025
$170,140
Expenses 2025
$216,109

Program services were 0.0% of total expenses calculated — Part III's total program service expenses over total expenses, both as filed.

As filed

Subsection
06
NTEE code
S41
Classification
1000
Street
13750 SUNRISE VALLEY DRIVE

These codes are the IRS's own and are shown exactly as filed. What each one means is in the Business Master File documentation (opens in a new tab).

Other organizations at this address

4 other organizations in the IRS Business Master File list the same street address. matched by us

We match the street line and ZIP code as the IRS gives them, ignoring case and outer spaces and nothing else, so "AVE" and "AVENUE" count as different streets and this list can miss some. A shared address can mean related organizations or a shared office, but it can also be a registered agent, a mail drop or a service provider holding mail for unrelated clients. It is not, by itself, evidence that two organizations are connected.

Mission and programs · 2025

Primary exempt purpose

Advance the masonry industry on building codes and standards

  • Energy Conservation: The MACS energy consultant, working with the PCA representative on ASHRAE 90.l, had their appeals on Addendum Z upheld. Addendum Z contains provisions requiring air barriers for building envelopes. They were found by some to be arbitrary, technically unfounded, and not economically justified. The appeal prevented these requirements from advancing to publication and being placed in the standard. If the provisions had advanced as written, single-wythe masonry in any jurisdiction that adopted the new ASHRAE 90.1 Energy Standard for New Buildings Except Low-rise Residential Buildings would be required to apply coatings and single-wythe construction would be priced out of the marketplace. While efforts to require air barriers will not disappear, they will continue to be addressed in the ASHRAE standards and I-codes. The successful appeal has given the masonry industry additional time to develop appropriate test methods and design and construction procedures to effectively and affordably reduce airflow through single-wythe masonry. In addition, the appeal should lead to refinement of the provisions to ensure, to the best degree possible, correct technical substantiation and economic justification. Other high priority energy issues include continued efforts to retain and improve thermal mass benefits, and to ensure that thermal resistance requirements for opaque walls are cost effective. Fire Protection: MACS supported efforts in the International Building Code (IBC) that resulted in the minimum number of exit stairways in high-rise buildings (those more than 420 ft) being increased from a minimum of two to three. Adding an additional stairway increases the total interior egress width of exit stairway shafts that may be used for evacuation downward while emergency responders on the same stairways are traversing upward. This change significantly improves life safety and the ability to control and extinguish fires. Stairway enclosures are required to be fire-rated construction. While such enclosures may not all be constructed of masonry, the product is an option to satisfy this requirement. However, like any code provision, once changes are included, they do not necessarily stay there. The extra stairway provision is being challenged. Stairways use space and reduce the rental or useable space per floor. Challenges are being made in this code cycle to eliminate the additional stairway. Other high priority fire safety code issues for masonry include retaining appropriate building height and area requirements, and minimizing trade-offs of passive fire protection for fire sprinklers. Structural Design: One of the biggest issues that affects the structural design of masonry being addressed by MACS is splice lengths in walls, which are a problem when the minimum amount calculated is larger than the height of the wall. Temporary relief was provided via code changes submitted by MACS to modify the IBC while the issue was being addressed in the structural design standard (MSJC). Other key structural issues address anchorage, maximum percentages of steel reinforcement, and grouting. Wind Issues: Sometimes the potential benefits of MACS code efforts are somewhat obscure. For example, MACS is supporting a code change that prohibits the use of gravel ballast for roofs exposed to high winds, thus requiring other alternatives for these systems. While one alternative may be an adhered single-ply roof in lieu of a ballasted single-ply roof, another option would be the use of interconnected masonry roof pavers. Also related to hurricanes and other high wind events, MACS provided a forum for the coordination of industry efforts to enhance the design and construction provisions that now appear in the International Code Council's Standard for Residential Construction in High Wind Regions (ICC-600). This standard is the result of an effort to update the Standard for Hurricane Resistant Residential Construction (SSTD 10), first published in 1999 by the Southern Building Code Congress International in response to the devastation resulting from Hurricane Andrew.

As filed on the 2025 return.

Officers and directors · 2025

As listed in Part VII of the 2025 return, in the order the filer printed them. Each return names its own; this is not a roster the organization keeps with us.

  • Charles Clark

    Chairman

    Total calculated
    $0
    Hours/week
    1
  • Nicholas Lang

    Vice-Chair

    Total calculated
    $0
    Hours/week
    0
  • Kurtis Siggard

    Treasurer

    Total calculated
    $0
    Hours/week
    1
  • Vacant

    Secretary

    Total calculated
    $0
    Hours/week
    0
  • Brian Trimble

    Member at Large

    Total calculated
    $0
    Hours/week
    0
  • Jerry Painter

    Member at Large

    Total calculated
    $0
    Hours/week
    0
  • Adam Hutchinson

    Member at Large

    Total calculated
    $0
    Hours/week
    0

Compensation is as filed in Part VII: reportable pay from this organization and from related organizations, other compensation, and hours per week. The total, marked calculated, is our sum of the three dollar columns, with a blank column counted as $0; the form itself has no total. On a Form 990-EZ the columns are Part IV's instead, and on a Form 990-PF Part VIII's — compensation, contributions to benefit plans, and expense account — and the total sums those. Earlier years are each on their own filing page.

Filings

  • 2025
    Revenue
    $170,140
    Expenses
    $216,109
    Contributions
    $0
    Grants paid
    $0
  • 2024
    Revenue
    $170,220
    Expenses
    $138,143
    Contributions
    $0
    Grants paid
    $0
  • 2023
    Revenue
    $156,636
    Expenses
    $165,091
    Contributions
    $0
    Grants paid
    $0
  • 2022
    Revenue
    $156,149
    Expenses
    $190,494
    Contributions
    $0
    Grants paid
    $0

The four totals the IRS asks for on Part I of the Form 990, as filed. A dash means the figure was not present on the return — not that it was zero.

Other returns filed

  • 2021 · 990-EZ

    Revenue
    $164,070
    Expenses
    $171,241
    Assets (EOY)
    $86,745

Nonprofiteer parses Forms 990, 990-EZ and 990-PF, in a window of recent tax years. These returns are recorded from the IRS e-file index, so their figures were extracted by that index rather than read from the return here — treat them as a different source from the filings above, not as more of the same record. A dash means the index carries no figure; Form 990-T listings carry none at all.

Grants made

No itemized grants to organizations. Schedule I is filed only by organizations that granted more than $5,000 to a recipient, so most filers have none.

Grants received

No itemized grant names this organization as a recipient. Only grants over $5,000 are itemized, and only by filers of the full Form 990.

Other IRS files

Auto-Revocation List

Not listed. The IRS publishes this list for organizations whose exemption was automatically revoked for failing to file for three consecutive years.

Publication 78

Not present in the most recent drop.

These are two separate IRS files on two separate schedules, shown as published and not reconciled with each other. Neither is a statement about whether a contribution is deductible today: 19,245 organizations appear in Publication 78 while the IRS's own revocation file lists them as currently revoked, more than half of those revoked before 2019. Absence from Publication 78 is evidence of nothing, and presence is not evidence either. Verify current status with the IRS before relying on it.

What this page reflects

The registration facts above come from the IRS Business Master File published 9 November 2026 and read 9 November 2026, for every organization at once. Returns through tax year 2025, the newest we have parsed for this organization.