Skip to content
Nonprofiteer
← All organizations

THE ELECTRIC INFRASTRUCTURE SECURITY

EIN 27-0713559 LOS ANGELES, CA

Browse the largest nonprofits in California

Revenue 2024
$1,902,731
Expenses 2024
$2,803,068

Program services were 81.5% of total expenses calculated — Part IX's program-services column over total expenses, both as filed.

As filed

Subsection
03
NTEE code
Q03
Classification
1000
Street
10767 NATIONAL PL

These codes are the IRS's own and are shown exactly as filed. What each one means is in the Business Master File documentation (opens in a new tab).

Mission and programs · 2024

Mission

THE MISSION OF THE ELECTRIC INFRASTRUCTURE SECURITY COUNCIL, INC. (THE "EIS COUNCIL") IS TO PROVIDE EDUCATIONAL PROGRAMMING AND HOST INTERNATIONAL INITIATIVES TO COORDINATE COLLABORATIVE INFRASTRUCTURE PROTECTION, RECOVERY PLANNING (CONTINUED ON SCHEDULE O)

Activities or mission (Part I)

THE MISSION OF THE ELECTRIC INFRASTRUCTURE SECURITY COUNCIL, INC. (CONTINUED ON SCHEDULE O) (THE "EIS COUNCIL") IS TO PROVIDE EDUCATIONAL PROGRAMMING AND HOST INTERNATIONAL INITIATIVES TO COORDINATE INFRASTRUCTURE PROTECTION AGAINST ELECTROMAGNETIC THREATS, IN PARTNERSHIP WITH GOVERNMENT REPRESENTATIVES AND NONGOVERNMENTAL ORGANIZATIONS ("NGOS"), WORKING BOTH,A. TO CONSIDER AND ADDRESS THE RISKS POSED TO CRITICAL ELECTRIC INFRASTRUCTURE FROM NATURAL SOURCES, SUCH AS SEVERE REGIONAL EARTHQUAKES, PANDEMICS, SOLAR FLARES (WHICH CAN CAUSE MASSIVE GEOMAGNETIC STORMS), AS WELL AS MAN-MADE SOURCES, SUCH AS A LARGE SCALE CYBER ATTACK OR A PHYSICAL ATTACK (E.G., ON CRITICAL GRID NODES OR WITH A HIGH ALTITUDE ELECTROMAGNETIC PULSE "HEMP"), AND B. TO STIMULATE NATIONAL AND INTERNATIONAL MULTI-SECTOR COORDINATION AND COOPERATION IN INFRASTRUCTURE PROTECTION.

  • GINOMDURING THIS REPORTING PERIOD, THE GINOM PROGRAM ADVANCED AS AN INNOVATIVE DECISION SUPPORT TOOL DESIGNED TO HELP LEADERS PREPARE FOR AND MANAGE COMPLEX CRISES. GINOM IS A UNIQUE MULTI-SECTOR INTERDEPENDENCY-INFORMED DECISION SUPPORT PLATFORM THAT ENABLES ANALYSIS OF CROSS-SECTOR CONNECTIONS BETWEEN CRITICAL INFRASTRUCTURE ASSETS SUCH AS ENERGY GENERATION, WATER DISTRIBUTION, COMMUNICATIONS, TRANSPORTATION. IN BOTH PLANNING AND REAL-TIME MODE, THE PLATFORM ANALYZES HOW DISRUPTIONS IN DIFFERENT SECTORS CASCADE THROUGH AN ENTIRE INTERCONNECTED SYSTEM, AND PROVIDES DECISION-MAKERS WITH DATA-DRIVEN VISIBILITY INTO VULNERABILITIES, (CONTINUED ON SCHEDULE O) INTERDEPENDENCIES, AND RECOVERY DECISION-CHAIN OPTIONS INFORMED BY THESE ASSESSMENTS. A. DEVELOPMENT PROGRESSMAJOR MILESTONES WERE ACHIEVED IN THE DEVELOPMENT OF THE SIMULATION AND ANALYTICS ENGINE. IN ITS CURRENT TESTBED IMPLEMENTATION, THE PLATFORM NOW SUPPORTS ASSET-LEVEL MODELING, CASCADING-EFFECT PROPAGATION, AND EVENT-BASED SCENARIOS. A NEW EXPLAINABLE-AI LAYER WAS DESIGNED AND IMPLEMENTED, INTERPRETING SCENARIO OUTCOMES AND PROVIDING CLEAR DECISION-CHAIN RECOMMENDATIONS FOR PREPAREDNESS AND RESPONSE PLANNING. WORK ALSO BEGAN ON AN INTERACTIVE FRONT-END INTERFACE ALLOWING USERS TO TEST CRISIS SCENARIOS AND VISUALIZE THE CHAIN REACTIONS AMONG CONNECTED SECTORS.B. FUNDING AND PARTNERSHIPSTHE EIS GINOM TEAM PURSUED MULTIPLE FUNDRAISING TRACKS, INCLUDING PROPOSALS TO THE EU EIC ACCELERATOR, THE HORIZON EUROPE FRAMEWORK, AND PHILANTHROPIC FOUNDATIONS FOCUSED ON TECHNOLOGY FOR PEACE AND RESILIENCE. THE TEAM ENGAGED WITH PARTNERS IN THE U.S., CANADA, AND ISRAEL TO FORM A SUSTAINABLE OPERATIONAL AND GOVERNANCE MODEL, ALIGNING PUBLIC, ACADEMIC, AND PRIVATE STAKEHOLDERS UNDER SHARED OBJECTIVES.C. COMMUNITY AND EDUCATIONTHE 2025 GLOBAL RESILIENCE WEBINAR SERIES, DEVELOPED JOINTLY WITH THE EIS COUNCIL, WAS LAUNCHED TO STRENGTHEN INTERNATIONAL COLLABORATION. MONTHLY SESSIONS FEATURED EXPERTS DISCUSSING RESILIENCE TOPICS ENERGY SECURITY, CYBER DEFENSE, EMERGENCY COORDINATION, AND URBAN PREPAREDNESS ALONGSIDE LIVE DEMONSTRATIONS OF GINOM'S ANALYTICAL CAPABILITIES. THESE EVENTS EXPANDED OUTREACH AND POSITIONED GINOM AS BOTH AN EDUCATIONAL AND OPERATIONAL TOOL.D. EARLY ADOPTERS PROGRAMAN EARLY ADOPTERS INITIATIVE WAS INTRODUCED TO ENGAGE FIRST-TIER USERS SUCH AS NATIONAL GRID OPERATORS, MUNICIPAL AUTHORITIES, AND HUMANITARIAN NGOS. PILOT DISCUSSIONS BEGAN IN ISRAEL, CANADA, AND THE UNITED STATES TO TEST THE POTENTIAL FOR GINOM'S USE FOR CRISIS PLANNING AND CONTINUITY EXERCISES.E. GINOM PORTAL AND ECOSYSTEMDURING THE REPORTING PERIOD, A COMMERCIAL WEBSITE FOR GINOM.AI WAS LAUNCHED, SERVING AS THE PROJECT'S PUBLIC-FACING PLATFORM. THE WEBSITE PROVIDES ACCESS TO WEBINARS, DETAILED EXPLANATIONS OF HOW THE GINOM SYSTEM OPERATES, AND AN ONLINE FORUM FOR ORGANIZATIONS INTERESTED IN JOINING THE PIONEERS PROGRAM. IN PARALLEL, DEVELOPMENT PROGRESSED ON THE GINOM PLATFORM, THE TEAM IS ADVANCING THE PLATFORM'S CORE INFRASTRUCTURE BY ESTABLISHING A TESTBED ENVIRONMENT WHERE SIMULATIONS ARE EXECUTED AND THE SYSTEM IS EVALUATED UNDER DIVERSE CRISIS SCENARIOS TO ENSURE ROBUSTNESS AND RELIABILITY. TOGETHER, THESE PLATFORMS STRENGTHEN GINOM'S GLOBAL PRESENCE AND SUPPORT THE CREATION OF A PROFESSIONAL COMMUNITY DEDICATED TO IMPROVING SYSTEMIC RESILIENCE AND CRISIS PREPAREDNESS.

    Expenses $2,284,309 · Revenue $283,425

  • Withheld by Nonprofiteer: this text may name a private individual.

  • CONFERENCES, WEBINARS AND DIGITAL COMMUNICATIONSEIS STRENGTHENED ITS GLOBAL ROLE AS A LEADING CONVENER AND KNOWLEDGE CENTER FOR INFRASTRUCTURE RESILIENCE. THROUGH HIGH-LEVEL SUMMITS, INTERNATIONAL SIMULATIONS, AND SECTOR-FOCUSED COLLABORATIONS, EIS ADVANCED ITS MISSION TO BUILD PREPAREDNESS, REDUNDANCY, AND RECOVERY CAPACITY ACROSS CRITICAL SYSTEMS.A. THE RESILIENT RENEWABLE SOCIETY SUMMIT IN LONDON (SEPTEMBER 23-24, 2024), ORGANIZED IN PARTNERSHIP WITH IMPERIAL COLLEGE LONDON, CONVENED SENIOR LEADERS FROM ACROSS THE WORLD IN GOVERNMENT, INDUSTRY, AND ACADEMIA TO ADDRESS EMERGING GLOBAL (CONTINUED ON SCHEDULE O) RESILIENCE CHALLENGES. THE CONFERENCE EXPLORED THE SYSTEMIC INTERDEPENDENCIES BETWEEN ENERGY, COMMUNICATIONS, AND FINANCE, AS WELL AS FRAMEWORKS FOR RESILIENT CITIES AND REGIONS, AND STRATEGIES FOR ENHANCING REDUNDANCY IN LIFELINE INFRASTRUCTURES. THE DISCUSSION ALSO FOCUSED ON THE ROLE OF INNOVATION AND RESEARCH IN RISK ASSESSMENT, RESILIENCE INVESTMENT, AND THE INTEGRATION OF ARTIFICIAL INTELLIGENCE TOOLS FOR CRISIS MANAGEMENT. THE EVENT REINFORCED THE POSITIONING OF EIS COUNCIL, IMPERIAL COLLEGE LONDON AND THE CITY OF LONDON'S AS A COLLABORATIVE, 3-PART HUB FOR GLOBAL RESILIENCE DIALOGUE AND ACADEMIC COLLABORATION.B. THE ELECTRIC SECTOR BLACK SKY RESILIENCE CONFERENCE IN WASHINGTON, D.C. (MAY 21-22, 2025), CO-HOSTED WITH EXELON AND PJM, FOCUSED ON CRITICAL ELECTRIC SECTOR RESILIENCE GAPS AND OPPORTUNITIES, AND ON THE OPERATIONAL REALITIES OF BLACKSTART READINESS, GRID TRANSITION, AND TODAY'S RAPIDLY GROWING GRID EXPANSION. SESSIONS, INCLUDING TWO LIVE SIMULATION EXERCISES, EXAMINED INVERTER-BASED RESOURCE CHALLENGES, OPERATIONAL COORDINATION DURING SYSTEM RESTORATION, CYBERPHYSICAL INTERDEPENDENCIES, AND PUBLICPRIVATE PARTNERSHIPS TO ENSURE ENERGY CONTINUITY UNDER EXTREME CONDITIONS. IN SUM THE SUMMIT HIGHLIGHTED THE IMPORTANCE OF DECISION-MAKER FOCUS AND COORDINATED PLANNING AND INVESTMENT IN RESILIENT GRID ARCHITECTURES.C. EARTH EX LIVE! EXERCISES. COMPLEMENTING THESE FLAGSHIP EVENTS, EIS CONTINUED TO EXPAND ITS ONLINE ENGAGEMENT AND SIMULATION PROGRAMS, HOSTING OVER A THOUSAND PARTICIPANTS. TWO EARTH EX LIVE! EXERCISES BROUGHT TOGETHER PARTICIPANTS FROM UTILITIES, MINISTRIES, AND NGOS TO PRACTICE COORDINATED RESPONSES TO LARGE-SCALE DISRUPTIONS AND CASCADING FAILURES.D. THE GINOM WEBINAR SERIES, FEATURING FIVE SESSIONS ADDRESSING VARIOUS TOPICS, INCLUDING THE HUMAN FACTOR IN CRISIS MANAGEMENT AND SIMULATIONS. THE WEBINARS ALSO EXPLORED THE DEVELOPMENT PROGRESS BEHIND THE GINOM PLATFORM.E. THE BLACK SKY RESILIENCE WEBINAR SERIES HOSTED SECTORAL RESILIENCE FORUMS THROUGH DIVERSE LENSES, INCLUDING HEALTH SYSTEM CONTINUITY AND WATER SECTOR PROTECTION.F. TWO BLACKSTART WEBINARS DEEPENED TECHNICAL AND POLICY UNDERSTANDING OF RESTART OPERATIONS AND REDUNDANCY PLANNING. THE BLACKSTART WEBINARS ARE ONE VEHICLE THAT EIS IS EMPLOYING TO PUBLICIZE AND SPREAD THE FINDINGS AND RECOMMENDATIONS IN THE EPRO V HANDBOOK, CITED IN TOPIC 3 ABOVE.G. EIS'S COMMUNICATIONS AND RESEARCH OUTPUT CONTINUED TO GROW, WITH MORE THAN 30 NEW BLOGS AND REGULAR DISSEMINATION OF POLICY AND TECHNICAL INSIGHTS TO A GLOBAL AUDIENCE OF OVER 15,000 NEWSLETTER SUBSCRIBERS. DAILY SOCIAL MEDIA UPDATES FURTHER EXTENDED OUTREACH AND COLLABORATION.H. BLACK SKY RESILIENCE WORKING GROUPS. EIS ALSO LEADS THREE ACTIVE WORKING GROUPS, COMPRISED OF EXPERTS FROM THE ELECTRIC AND OTHER CRITICAL INFRASTRUCTURE SECTORS, GOVERNMENT AND REGULATORS AT THE FEDERAL AND STATE LEVELS, ACADEMIA, AND NGOS. THE WORKING GROUPS DEVELOP COORDINATED STRATEGIES, POLICY RECOMMENDATIONS, AND BEST PRACTICES FOR MULTI-SECTOR RESILIENCE IN THREE TOPIC AREAS: - EMERGENCY COMMUNICATIONS AND EMERGENCY MANAGEMENT- RESILIENCE AND REDUNDANCY POLICY - ELECTRIC GRID BLACKSTARTEACH WORKING GROUP WILL DEVELOP PERIODIC REPORTS ON THEIR FINDINGS, FOR BRIEFING TO KEY PRIVATE AND PUBLIC SECTOR DECISION MAKING AND POLICY ORGANIZATIONS.

  • ENERGY SECTOR WEB (ESWEB) EXPANSIONEIS COUNCIL CREATED THE ENERGY SECTOR WEB (ESWEB) INITIATIVE TO ADDRESS A SERIOUS ENERGY SECTOR COMMUNICATIONS SHORTFALL IN BLACK SKY-CLASS BLACKSTART SCENARIOS, IN WHICH NORMAL MEANS FOR INTEROPERABLE CROSS-CORPORATE COMMUNICATION WILL LIKELY FAIL. THE SYSTEM'S ARCHITECTURE IS DESIGNED TO LEVERAGE ENERGY SECTOR CORPORATIONS' EXISTING, EXTENSIVE CORPORATE-OWNED FIBEROPTIC ASSETS, FUNCTIONING AS A CYBER AND EMP-SECURE CORPORATE-OWNED AND OPERATED INTEROPERABLE COMMUNICATION SYSTEM.CURRENT STATUS:A. THE FINAL STAGES OF THE INITIAL ESWEB PROOF-OF-CONCEPT PROJECT (BETWEEN DOMINION ENERGY, EXELON, AND PJM) HAVE BEEN FULLY TESTED AND VERIFIED.B. THE ESWEB INITIATIVE IS NOW ALSO BEING ACTIVELY PURSUED BY THE TENNESSEE VALLEY AUTHORITY (TVA) AND THE MIDWEST INDEPENDENT SYSTEM OPERATOR (MISO).C. TWO MORE PROSPECTIVE PARTNERS, DUKE ENERGY AND NATIONAL GRID, ARE POISED TO JOIN ESWEB, AND EIS IS ALSO REACHING OUT TO THE CANADIAN POWER COMPANY HYDRO ONE.INTERNATIONAL BLACK SKY RESILIENCE ENGAGEMENTIN ADDITION TO THE ACTIVITIES REPORTED ON ABOVE, THE COUNCIL ALSO MAINTAINS BLACK SKY RESILIENCE INITIATIVES WITH AN INTERNATIONAL FOCUS, INCLUDING EFFORTS SPECIFICALLY FOCUSED ON THIS MISSION IN THE US, CANADA, ISRAEL, THE UK AND EUROPE. THESE IN-PROGRESS EFFORTS ARE IN CONTINUING DEVELOPMENT, AND REPORTING ON CURRENT STATUS IS MADE AVAILABLE TO INTERESTED ORGANIZATIONS.

As filed on the 2024 return. The filer continues this part on Schedule O, which is not shown here. A text marked withheld matched a screen for wording that may name a private individual, such as an honorific or "in memory of". Most of what it withholds names no one; it is withheld so that what does is never shown.

Officers and directors · 2024

As listed in Part VII of the 2024 return, in the order the filer printed them. Each return names its own; this is not a roster the organization keeps with us.

  • Paul Williams

    PRESIDENT (THRU 04/25) & DIRECTOR

    Total calculated
    $224,917
    From this org
    $224,917
    From related orgs
    $0
    Other
    $0
    Hours/week
    40

    Schedule J breakdown matched by us

    Base
    $211,667
    Bonus
    $0
    Other
    $13,250
    Deferred
    $0
    Nontaxable benefits
    $0
    Filer's total
    $224,917
  • Avi Schnurr

    CEO & DIRECTOR

    Total calculated
    $0
    Hours/week
    40
  • David Horwatt

    SECRETARY/TREASURER/DIRECTOR

    Total calculated
    $0
    Hours/week
    20
  • Kevin Curtis

    DIRECTOR

    Total calculated
    $0
    Hours/week
    10
  • Rita Emerson

    DIRECTOR

    Total calculated
    $0
    Hours/week
    10
  • John Houston

    DIRECTOR

    Total calculated
    $0
    Hours/week
    10
  • Dr Neil Siegel

    DIRECTOR

    Total calculated
    $0
    Hours/week
    10
  • Christopher A Beck

    VP POLICY & STRATEGIC INITIATIVE

    Total calculated
    $177,838
    From this org
    $172,000
    From related orgs
    $0
    Other
    $5,838
    Hours/week
    40

    Schedule J breakdown matched by us

    Base
    $172,000
    Bonus
    $0
    Other
    $0
    Deferred
    $0
    Nontaxable benefits
    $5,838
    Filer's total
    $177,838
  • Dr Ehud Ganani

    VICE-PRESIDENT

    Total calculated
    $95,556
    From this org
    $95,556
    From related orgs
    $0
    Other
    $0
    Hours/week
    40

Compensation is as filed in Part VII: reportable pay from this organization and from related organizations, other compensation, and hours per week. The total, marked calculated, is our sum of the three dollar columns, with a blank column counted as $0; the form itself has no total. On a Form 990-EZ the columns are Part IV's instead, and on a Form 990-PF Part VIII's — compensation, contributions to benefit plans, and expense account — and the total sums those. A Schedule J breakdown is as filed: base pay, bonus, other, deferred compensation and nontaxable benefits from this organization, with any from related organizations beside each, and the filer's own total. It is shown with the Part VII listing of the same name on the same return. The form gives no key between the two, so that pairing is ours, and is marked matched by us. Earlier years are each on their own filing page.

Filings

  • 2024
    Revenue
    $1,902,731
    Expenses
    $2,803,068
    Contributions
    $1,600,000
    Grants paid
    $0
  • 2023
    Revenue
    $1,824,077
    Expenses
    $1,817,503
    Contributions
    $1,755,000
    Grants paid
    $0
  • 2022
    Revenue
    $1,253,937
    Expenses
    $1,186,013
    Contributions
    $1,125,000
    Grants paid
    $0

The four totals the IRS asks for on Part I of the Form 990, as filed. A dash means the figure was not present on the return — not that it was zero.

Other returns filed

  • 2021 · 990

    Revenue
    $1,219,867
    Expenses
    $1,618,200
    Assets (EOY)
    $1,122,621
  • 2020 · 990

    Revenue
    $2,710,891
    Expenses
    $2,198,413
    Assets (EOY)
    $1,724,309
  • 2019 · 990

    Revenue
    $1,068,607
    Expenses
    $2,423,602
    Assets (EOY)
    $1,065,269
  • 2018 · 990

    Revenue
    $3,193,690
    Expenses
    $3,425,374
    Assets (EOY)
    $2,539,080
  • 2017 · 990

    Revenue
    $4,627,019
    Expenses
    $4,293,832
    Assets (EOY)
    $3,881,175
  • 2016 · 990

    Revenue
    $3,958,292
    Expenses
    $3,559,453
    Assets (EOY)
    $2,667,620

Nonprofiteer parses Forms 990, 990-EZ and 990-PF, in a window of recent tax years. These returns are recorded from the IRS e-file index, so their figures were extracted by that index rather than read from the return here — treat them as a different source from the filings above, not as more of the same record. A dash means the index carries no figure; Form 990-T listings carry none at all.

Grants made

No itemized grants to organizations. Schedule I is filed only by organizations that granted more than $5,000 to a recipient, so most filers have none.

Grants received

Other IRS files

Auto-Revocation List

Not listed. The IRS publishes this list for organizations whose exemption was automatically revoked for failing to file for three consecutive years.

Publication 78

Listed as of 11 November 2026, under deductibility PC.

These are two separate IRS files on two separate schedules, shown as published and not reconciled with each other. Neither is a statement about whether a contribution is deductible today: 19,245 organizations appear in Publication 78 while the IRS's own revocation file lists them as currently revoked, more than half of those revoked before 2019. Absence from Publication 78 is evidence of nothing, and presence is not evidence either. Verify current status with the IRS before relying on it.

What this page reflects

The registration facts above come from the IRS Business Master File published 9 November 2026 and read 9 November 2026, for every organization at once. Returns through tax year 2024, the newest we have parsed for this organization.